Let a remodeler in Zap give you an estimate on your project Request a FREE Quote
Get a Free Quote
 Loading service costs...
Search

What is the cost for construction project management in Zap ND?

Home Remodeling & Home Services Cost Estimates

projects

ITEM QUANTITY LOW HIGH
Building Project Labor
Direct labor expenses to manage building project.
70.4 hours $631.77 $680.56
Total Cost to Manage Building Projects
1 project $631.77 $680.56
  Average cost per project $631.77 $680.56

This is an estimate. You can get an accurate quote for your project from a Zap additions and remodels pro.

Cost to Manage Building Projects - 2024 Cost Calculator

To Manage Building Projects in Zap you should expect to pay in the range of $631.77 to $680.56. What we use to calculate Zap Construction Project Management estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Construction Project Management in Zap project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per project for Construction Project Management in Zap

The average cost to Manage Building Projects in Zap 2024 is $631.77 to $680.56 per project. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Zap Construction Project Management projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Construction Project Management in Zap

  1. Direct labor costs to Manage Building Projects in Zap - between $631.77 and $680.56.

What the Zap Building Project Estimate Includes:

  1. Costs associated with worksite preparation for the Construction Project Management in Zap project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Zap materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Construction Project Management projects.

What the Building Project Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Zap building department.
  2. North Dakota and Zap sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Zap Construction Project Management project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services