Let a landscape architect in Tillatoba give you an estimate on your project Request a FREE Quote

What are the prices for trench backfilling in Tillatoba MS?

Home Remodeling & Home Services Cost Estimates

feet

ITEM QUANTITY LOW HIGH
Trench Labor
Direct labor expenses to backfill trench.
3 hours $116.12 $134.03
Total Cost to Backfill Trenches
26 feet $116.12 $134.03
  Average cost per linear foot $4.65 $5.36

This is an estimate. You can get an accurate quote for your project from a Tillatoba landscaping pro.

Cost to Backfill Trenches - 2025 Cost Calculator

To Backfill Trenches in Tillatoba you should expect to pay in the range of $116.12 to $134.03. What we use to calculate Tillatoba Trench Backfilling estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Trench Backfilling in Tillatoba project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per linear foot for Trench Backfilling in Tillatoba

The average cost to Backfill Trenches in Tillatoba 2025 is $4.65 to $5.36 per linear foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Tillatoba Trench Backfilling projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Trench Backfilling in Tillatoba

  1. Direct labor costs to Backfill Trenches in Tillatoba - between $116.12 and $134.03.

What the Tillatoba Trench Filling Estimate Includes:

  1. Costs associated with worksite preparation for the Trench Backfilling in Tillatoba project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Tillatoba materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Trench Backfilling projects.

What the Trench Filling Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Tillatoba building department.
  2. Mississippi and Tillatoba sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Tillatoba Trench Backfilling project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services