Let a demolition expert in Strabane give you an estimate on your project Request a FREE Quote

What is the price for vent removal in Strabane PA?

Home Remodeling & Home Services Cost Estimates

lines

ITEM QUANTITY LOW HIGH
Vent Branch Line Labor
Direct labor expenses to remove vent.
2 hours $61.84 $107.95
Vent Branch Line Debris Disposal Costs
Costs to load and haul away old materials and installation waste.
$19.40 $24.25
Total Cost to Remove Vents
1 line $81.24 $132.20
  Average cost per line $81.24 $132.20

This is an estimate. You can get an accurate quote for your project from a Strabane demolition pro.

Cost to Remove Vents - 2025 Cost Calculator

To Remove Vents in Strabane you should expect to pay in the range of $81.24 to $132.20. What we use to calculate Strabane Vent Removal estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Vent Removal in Strabane project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per line for Vent Removal in Strabane

The average cost to Remove Vents in Strabane 2025 is $81.24 to $132.20 per line. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Strabane Vent Removal projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Vent Removal in Strabane

  1. Direct labor costs to Remove Vents in Strabane - between $61.84 and $107.95.

What the Strabane Vent Removal Estimate Includes:

  1. Costs associated with worksite preparation for the Vent Removal in Strabane project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Strabane materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Vent Removal projects.

What the Vent Removal Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Strabane building department.
  2. Pennsylvania and Strabane sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Strabane Vent Removal project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services