Let a siding contractor in Navajo Dam give you an estimate on your project Request a FREE Quote
Get a Free Quote
 Loading service costs...
Search

What is the price for soffit framing in Navajo Dam NM?

Home Remodeling & Home Services Cost Estimates

linear feet

ITEM QUANTITY LOW HIGH
Soffit Labor
Direct labor expenses to frame soffit.
56.7 hours $1,664.82 $1,766.74
Soffit Job Materials and Supplies
Cost of supplies that may be required to frame soffit including: fasteners and connectors.
50 linear feet $93.61 $101.37
Soffit Equipment Allowance
Job related costs of specialty equipment used for job quality and efficiency, including: pneumatic framing nailer, 12" miter saw and 3 1/4" electric planer.
$27.65 $46.56
Total Cost to Frame Soffits
54 linear feet $1,786.07 $1,914.66
  Average cost per linear foot $35.73 $38.30

This is an estimate. You can get an accurate quote for your project from a Navajo Dam siding pro.

Cost to Frame Soffits - 2024 Cost Calculator

To Frame Soffits in Navajo Dam you should expect to pay in the range of $1,786.07 to $1,914.66. What we use to calculate Navajo Dam Soffit Framing estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Soffit Framing in Navajo Dam project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per linear foot for Soffit Framing in Navajo Dam

The average cost to Frame Soffits in Navajo Dam 2024 is $35.73 to $38.30 per linear foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Navajo Dam Soffit Framing projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Soffit Framing in Navajo Dam

  1. Direct labor costs to Frame Soffits in Navajo Dam - between $1,664.82 and $1,766.74.
  2. Cost of all materials and supplies which may be necessary for Soffit Framing , which may include: - between $93.61 and $101.37.
  3. Costs of specialty equipment used for efficiency and job quality, which may include: - between $27.65 and $46.56.

What the Navajo Dam Soffit Framing Estimate Includes:

  1. Costs associated with worksite preparation for the Soffit Framing in Navajo Dam project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Navajo Dam materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Soffit Framing projects.

What the Soffit Framing Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Navajo Dam building department.
  2. New Mexico and Navajo Dam sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Navajo Dam Soffit Framing project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services

Help your friends save money on remodeling costs, like our page!

Facebook

No thanks, I’m just looking.