Let a landscape architect in Prince George give you an estimate on your project Request a FREE Quote

What are the prices for post hole backfilling in Prince George VA?

Home Remodeling & Home Services Cost Estimates

holes

ITEM QUANTITY LOW HIGH
Hole Labor
Direct labor expenses to backfill post hole.
2 hours $88.33 $88.33
Total Cost to Backfill Post Holes
1 hole $88.33 $88.33
  Average cost per hole $88.33 $88.33

This is an estimate. You can get an accurate quote for your project from a Prince George landscaping pro.

Cost to Backfill Post Holes - 2025 Cost Calculator

To Backfill Post Holes in Prince George you should expect to pay in the range of $88.33 to $88.33. What we use to calculate Prince George Post Hole Backfilling estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Post Hole Backfilling in Prince George project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per hole for Post Hole Backfilling in Prince George

The average cost to Backfill Post Holes in Prince George 2025 is $88.33 to $88.33 per hole. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Prince George Post Hole Backfilling projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Post Hole Backfilling in Prince George

  1. Direct labor costs to Backfill Post Holes in Prince George - between $88.33 and $88.33.

What the Prince George Post Hole Filling Estimate Includes:

  1. Costs associated with worksite preparation for the Post Hole Backfilling in Prince George project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Prince George materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Post Hole Backfilling projects.

What the Post Hole Filling Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Prince George building department.
  2. Virginia and Prince George sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Prince George Post Hole Backfilling project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services