Cost to Set Concrete Formwork - 2024 Cost Calculator
To Set Concrete Formwork in O Brien you should expect to pay in the range of $390.46 to $456.10. What we use to calculate O Brien Concrete Form Setup estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Concrete Form Setup in O Brien project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
Average Cost per square foot for Concrete Form Setup in O Brien
The average cost to Set Concrete Formwork in O Brien 2024 is $1.95 to $2.28 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on O Brien Concrete Form Setup projects always make sure to receive project estimates from several contractors.
Cost Breakdown for Concrete Form Setup in O Brien
- Non-discounted retail costs for 215 square feet of Formwork Setup - between $60.99 and $78.20.
- Direct labor costs to Set Concrete Formwork in O Brien - between $279.36 and $307.01.
- Cost of all materials and supplies which may be necessary for Concrete Form Setup , which may include: - between $22.47 and $24.33.
- Costs of specialty equipment used for efficiency and job quality, which may include: - between $27.65 and $46.56.
What the O Brien Formwork Setup Estimate Includes:
- Costs associated with worksite preparation for the Concrete Form Setup in O Brien project, which may include any costs for materials, components, protection of existing structures and finishes.
- Costs for all local O Brien materials and equipment delivery to the work site.
- Costs for junk/debris removal and job cleanup after project completion.
- Hourly charges, labor setup and mobilization time that are usually associated with Concrete Form Setup projects.
What the Formwork Setup Estimate Does Not Include:
- Any fees for permits or inspection which may be required for the project by the O Brien building department.
- Florida and O Brien sales taxes on supplies and materials.
- Any general contractor fees for supervision of the O Brien Concrete Form Setup project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.