Let a mason in Maida give you an estimate on your project Request a FREE Quote

What is the price for fog seal coating in Maida ND?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Fog Seal Labor
Direct labor expenses to topcoat fog seal.
5.5 hours $164.77 $332.55
Fog Seal Job Materials and Supplies
Cost of supplies that may be required to topcoat fog seal including: sealant.
200 square feet $26.21 $48.50
Total Cost to Topcoat Fog Sealant
215 square feet $190.98 $381.05
  Average cost per square foot $0.95 $1.90

This is an estimate. You can get an accurate quote for your project from a Maida concrete and masonry pro.

Cost to Topcoat Fog Sealant - 2025 Cost Calculator

To Topcoat Fog Sealant in Maida you should expect to pay in the range of $190.98 to $381.05. What we use to calculate Maida Fog Seal Coating estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Fog Seal Coating in Maida project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Fog Seal Coating in Maida

The average cost to Topcoat Fog Sealant in Maida 2025 is $0.95 to $1.90 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Maida Fog Seal Coating projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Fog Seal Coating in Maida

  1. Direct labor costs to Topcoat Fog Sealant in Maida - between $164.77 and $332.55.
  2. Cost of all materials and supplies which may be necessary for Fog Seal Coating , which may include: - between $26.21 and $48.50.

What the Maida Fog Seal Coating Estimate Includes:

  1. Costs associated with worksite preparation for the Fog Seal Coating in Maida project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Maida materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Fog Seal Coating projects.

What the Fog Seal Coating Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Maida building department.
  2. North Dakota and Maida sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Maida Fog Seal Coating project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services