Let a demolition expert in Loda give you an estimate on your project Request a FREE Quote
Get a Free Quote
 Loading service costs...
Search

What are the costs for flooring removal in Loda IL?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Flooring Labor
Direct labor expenses to remove flooring.
15.4 hours $211.19 $557.38
Flooring Debris Disposal Costs
Costs to load and haul away old materials and installation waste.
$45.84 $50.69
Total Cost to Remove Flooring
215 square feet $257.03 $608.07
  Average cost per square foot $1.28 $3.04

This is an estimate. You can get an accurate quote for your project from a Loda demolition pro.

Cost to Remove Flooring - 2024 Cost Calculator

To Remove Flooring in Loda you should expect to pay in the range of $257.03 to $608.07. What we use to calculate Loda Flooring Removal estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Flooring Removal in Loda project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Flooring Removal in Loda

The average cost to Remove Flooring in Loda 2024 is $1.28 to $3.04 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Loda Flooring Removal projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Flooring Removal in Loda

  1. Direct labor costs to Remove Flooring in Loda - between $211.19 and $557.38.

What the Loda Flooring Removal Estimate Includes:

  1. Costs associated with worksite preparation for the Flooring Removal in Loda project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Loda materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Flooring Removal projects.

What the Flooring Removal Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Loda building department.
  2. Illinois and Loda sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Loda Flooring Removal project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services