Home Remodeling & Home Services Cost Estimates
ITEM | QUANTITY | LOW | HIGH |
---|---|---|---|
|
2.2 hours | $95.09 | $171.99 |
|
1 door | $24.25 | $38.80 |
|
1 door | $119.34 | $210.79 |
Average cost per door | $119.34 | $210.79 |
To Stain And Finish Doors in J B P H H you should expect to pay in the range of $119.34 to $210.79. What we use to calculate J B P H H Door Staining And Finishing estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Door Staining And Finishing in J B P H H project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
The average cost to Stain And Finish Doors in J B P H H 2025 is $119.34 to $210.79 per door. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on J B P H H Door Staining And Finishing projects always make sure to receive project estimates from several contractors.