Let a painter in Camp Sherman give you an estimate on your project Request a FREE Quote

What are the prices for molding painting in Camp Sherman OR?

Home Remodeling & Home Services Cost Estimates

linear feet

ITEM QUANTITY LOW HIGH
Trim Paint Labor
Direct labor expenses to paint molding.
2 hours $62.01 $110.54
Trim Paint Job Materials and Supplies
Cost of supplies that may be required to paint molding including: masking tape and paper, surface repair material, solvents and cleanup supplies.
50 linear feet $24.25 $38.80
Total Cost to Paint Molding
54 linear feet $86.26 $149.34
  Average cost per linear foot $1.73 $2.99

This is an estimate. You can get an accurate quote for your project from a Camp Sherman painting pro.

Cost to Paint Molding - 2025 Cost Calculator

To Paint Molding in Camp Sherman you should expect to pay in the range of $86.26 to $149.34. What we use to calculate Camp Sherman Molding Painting estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Molding Painting in Camp Sherman project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per linear foot for Molding Painting in Camp Sherman

The average cost to Paint Molding in Camp Sherman 2025 is $1.73 to $2.99 per linear foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Camp Sherman Molding Painting projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Molding Painting in Camp Sherman

  1. Direct labor costs to Paint Molding in Camp Sherman - between $62.01 and $110.54.
  2. Cost of all materials and supplies which may be necessary for Molding Painting , which may include: - between $24.25 and $38.80.

What the Camp Sherman Molding Painting Estimate Includes:

  1. Costs associated with worksite preparation for the Molding Painting in Camp Sherman project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Camp Sherman materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Molding Painting projects.

What the Molding Painting Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Camp Sherman building department.
  2. Oregon and Camp Sherman sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Camp Sherman Molding Painting project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services