Let a carpenter in Hernshaw give you an estimate on your project Request a FREE Quote

What are the prices for wall framing in Hernshaw WV?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Framed Wall Labor
Direct labor expenses to frame wall.
6.5 hours $196.03 $227.19
Framed Wall Job Materials and Supplies
Cost of supplies that may be required to frame wall including: fasteners and connectors.
200 square feet $4,469.64 $4,840.18
Framed Wall Equipment Allowance
Job related costs of specialty equipment used for job quality and efficiency, including: pneumatic framing nailer, 12" miter saw and 3 1/4" electric planer.
$27.65 $46.56
Total Cost to Frame Walls
215 square feet $4,693.32 $5,113.94
  Average cost per square foot $23.46 $25.57

This is an estimate. You can get an accurate quote for your project from a Hernshaw carpentry pro.

Cost to Frame Walls - 2025 Cost Calculator

To Frame Walls in Hernshaw you should expect to pay in the range of $4,693.32 to $5,113.94. What we use to calculate Hernshaw Wall Framing estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Wall Framing in Hernshaw project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Wall Framing in Hernshaw

The average cost to Frame Walls in Hernshaw 2025 is $23.46 to $25.57 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Hernshaw Wall Framing projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Wall Framing in Hernshaw

  1. Direct labor costs to Frame Walls in Hernshaw - between $196.03 and $227.19.
  2. Cost of all materials and supplies which may be necessary for Wall Framing , which may include: - between $4,469.64 and $4,840.18.
  3. Costs of specialty equipment used for efficiency and job quality, which may include: - between $27.65 and $46.56.

What the Hernshaw Wall Framing Estimate Includes:

  1. Costs associated with worksite preparation for the Wall Framing in Hernshaw project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Hernshaw materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Wall Framing projects.

What the Wall Framing Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Hernshaw building department.
  2. West Virginia and Hernshaw sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Hernshaw Wall Framing project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services