Let a demolition expert in Okmulgee give you an estimate on your project Request a FREE Quote

What are the prices for toilet removal in Okmulgee OK?

Home Remodeling & Home Services Cost Estimates

toilets

ITEM QUANTITY LOW HIGH
Toilet Labor
Direct labor expenses to remove toilet.
3.1 hours $30.03 $80.10
Toilet Debris Disposal Costs
Costs to load and haul away old materials and installation waste.
$19.40 $24.25
Total Cost to Remove Toilets
1 toilet $49.43 $104.35
  Average cost per toilet $49.43 $104.35

This is an estimate. You can get an accurate quote for your project from a Okmulgee demolition pro.

Cost to Remove Toilets - 2025 Cost Calculator

To Remove Toilets in Okmulgee you should expect to pay in the range of $49.43 to $104.35. What we use to calculate Okmulgee Toilet Removal estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Toilet Removal in Okmulgee project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per toilet for Toilet Removal in Okmulgee

The average cost to Remove Toilets in Okmulgee 2025 is $49.43 to $104.35 per toilet. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Okmulgee Toilet Removal projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Toilet Removal in Okmulgee

  1. Direct labor costs to Remove Toilets in Okmulgee - between $30.03 and $80.10.

What the Okmulgee Toilet Removal Estimate Includes:

  1. Costs associated with worksite preparation for the Toilet Removal in Okmulgee project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Okmulgee materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Toilet Removal projects.

What the Toilet Removal Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Okmulgee building department.
  2. Oklahoma and Okmulgee sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Okmulgee Toilet Removal project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services