Cost to Install Air Exchangers - 2024 Cost Calculator
To Install Air Exchangers in Sophia you should expect to pay in the range of $1,167.61 to $1,499.40. What we use to calculate Sophia Air Exchanger Installation estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Air Exchanger Installation in Sophia project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
Average Cost per exchanger for Air Exchanger Installation in Sophia
The average cost to Install Air Exchangers in Sophia 2024 is $1,167.61 to $1,499.40 per exchanger. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Sophia Air Exchanger Installation projects always make sure to receive project estimates from several contractors.
Cost Breakdown for Air Exchanger Installation in Sophia
- Non-discounted retail costs for 1 exchanger of Air Exchanger - between $905.15 and $1,223.30.
- Direct labor costs to Install Air Exchangers in Sophia - between $218.06 and $228.00.
- Cost of all materials and supplies which may be necessary for Air Exchanger Installation , which may include: - between $44.42 and $48.10.
What the Sophia Air Exchanger Estimate Includes:
- Costs associated with worksite preparation for the Air Exchanger Installation in Sophia project, which may include any costs for materials, components, protection of existing structures and finishes.
- Costs for all local Sophia materials and equipment delivery to the work site.
- Costs for junk/debris removal and job cleanup after project completion.
- Hourly charges, labor setup and mobilization time that are usually associated with Air Exchanger Installation projects.
What the Air Exchanger Estimate Does Not Include:
- Any fees for permits or inspection which may be required for the project by the Sophia building department.
- North Carolina and Sophia sales taxes on supplies and materials.
- Any general contractor fees for supervision of the Sophia Air Exchanger Installation project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.