What are the prices for lighting fixture removal in Green Bank WV?

Home Remodeling & Home Services Cost Estimates

fixtures

ITEM QUANTITY LOW HIGH
Lighting Fixture Labor
Direct labor expenses to remove lighting fixtures.
2 hours $12.40 $150.75
Lighting Fixture Debris Disposal Costs
Costs to load and haul away old materials and installation waste.
$19.40 $24.25
Total Cost to Remove Lighting Fixtures
1 fixture $31.80 $175.00
  Average cost per fixture $31.80 $175.00

This is an estimate. You can get an accurate quote for your project from a Green Bank demolition pro.

Cost to Remove Lighting Fixtures - 2024 Cost Calculator

To Remove Lighting Fixtures in Green Bank you should expect to pay in the range of $31.80 to $175.00. What we use to calculate Green Bank Lighting Fixture Removal estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Lighting Fixture Removal in Green Bank project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per fixture for Lighting Fixture Removal in Green Bank

The average cost to Remove Lighting Fixtures in Green Bank 2024 is $31.80 to $175.00 per fixture. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Green Bank Lighting Fixture Removal projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Lighting Fixture Removal in Green Bank

  1. Direct labor costs to Remove Lighting Fixtures in Green Bank - between $12.40 and $150.75.

What the Green Bank Lighting Fixture Removal Estimate Includes:

  1. Costs associated with worksite preparation for the Lighting Fixture Removal in Green Bank project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Green Bank materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Lighting Fixture Removal projects.

What the Lighting Fixture Removal Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Green Bank building department.
  2. West Virginia and Green Bank sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Green Bank Lighting Fixture Removal project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.