Cost to Clear Land - 2024 Cost Calculator
To Clear Land in South Haven you should expect to pay in the range of $268.50 to $390.02. What we use to calculate South Haven Land Clearing estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Land Clearing in South Haven project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
Average Cost per square foot for Land Clearing in South Haven
The average cost to Clear Land in South Haven 2024 is $1.34 to $1.95 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on South Haven Land Clearing projects always make sure to receive project estimates from several contractors.
Cost Breakdown for Land Clearing in South Haven
- Direct labor costs to Clear Land in South Haven - between $112.08 and $168.13.
- Costs of specialty equipment used for efficiency and job quality, which may include: - between $156.41 and $221.89.
What the South Haven Land Clearing Estimate Includes:
- Costs associated with worksite preparation for the Land Clearing in South Haven project, which may include any costs for materials, components, protection of existing structures and finishes.
- Costs for all local South Haven materials and equipment delivery to the work site.
- Costs for junk/debris removal and job cleanup after project completion.
- Hourly charges, labor setup and mobilization time that are usually associated with Land Clearing projects.
What the Land Clearing Estimate Does Not Include:
- Any fees for permits or inspection which may be required for the project by the South Haven building department.
- Michigan and South Haven sales taxes on supplies and materials.
- Any general contractor fees for supervision of the South Haven Land Clearing project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.