Let a water damage contractor in Kodak give you an estimate on your project Request a FREE Quote
Get a Free Quote
 Loading service costs...
Search

What is the cost for flood cleanup in Kodak TN?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Flood Damage Cleanup Labor
Direct labor expenses to cleanup flood damage.
33.4 hours $2,334.86 $2,760.83
Flood Damage Cleanup Job Materials and Supplies
Cost of supplies that may be required to cleanup flood adamage including: fasteners and connectors.
200 square feet $608.44 $658.88
Total Cost to Cleanup Flood Damage
215 square feet $2,943.30 $3,419.72
  Average cost per square foot $14.71 $17.10

This is an estimate. You can get an accurate quote for your project from a Kodak water damage restoration pro.

Cost to Cleanup Flood Damage - 2024 Cost Calculator

To Cleanup Flood Damage in Kodak you should expect to pay in the range of $2,943.30 to $3,419.72. What we use to calculate Kodak Flood Cleanup estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Flood Cleanup in Kodak project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Flood Cleanup in Kodak

The average cost to Cleanup Flood Damage in Kodak 2024 is $14.71 to $17.10 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Kodak Flood Cleanup projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Flood Cleanup in Kodak

  1. Direct labor costs to Cleanup Flood Damage in Kodak - between $2,334.86 and $2,760.83.
  2. Cost of all materials and supplies which may be necessary for Flood Cleanup, which may include: - between $608.44 and $658.88.

What the Kodak Food Damage Estimate Includes:

  1. Costs associated with worksite preparation for the Flood Cleanup in Kodak project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Kodak materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Flood Cleanup projects.

What the Food Damage Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Kodak building department.
  2. Tennessee and Kodak sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Kodak Flood Cleanup project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services

Help your friends save money on remodeling costs, like our page!

Facebook

No thanks, I’m just looking.