Let a demolition expert in Vardaman give you an estimate on your project Request a FREE Quote

What are the costs for kitchen flooring removal in Vardaman MS?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Kitchen Floor Labor
Direct labor expenses to remove kitchen floor.
30.4 hours $299.11 $790.00
Kitchen Floor Debris Disposal Costs
Costs to load and haul away old materials and installation waste.
$148.95 $164.73
Total Cost to Remove Kitchen Flooring
215 square feet $448.06 $954.72
  Average cost per square foot $2.24 $4.77

This is an estimate. You can get an accurate quote for your project from a Vardaman demolition pro.

Cost to Remove Kitchen Flooring - 2025 Cost Calculator

To Remove Kitchen Flooring in Vardaman you should expect to pay in the range of $448.06 to $954.72. What we use to calculate Vardaman Kitchen Flooring Removal estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Kitchen Flooring Removal in Vardaman project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Kitchen Flooring Removal in Vardaman

The average cost to Remove Kitchen Flooring in Vardaman 2025 is $2.24 to $4.77 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Vardaman Kitchen Flooring Removal projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Kitchen Flooring Removal in Vardaman

  1. Direct labor costs to Remove Kitchen Flooring in Vardaman - between $299.11 and $790.00.

What the Vardaman Kitchen Flooring Removal Estimate Includes:

  1. Costs associated with worksite preparation for the Kitchen Flooring Removal in Vardaman project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Vardaman materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Kitchen Flooring Removal projects.

What the Kitchen Flooring Removal Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Vardaman building department.
  2. Mississippi and Vardaman sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Vardaman Kitchen Flooring Removal project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services