Let a remodeler in J B P H H give you an estimate on your project Request a FREE Quote

What are the prices for sub-contractor management in J B P H H HI?

Home Remodeling & Home Services Cost Estimates

hirings

ITEM QUANTITY LOW HIGH
Hiring Labor
Direct labor expenses to hire and manage subcontractors.
10.7 hours $773.67 $1,221.54
Total Cost to Hire And Manage Subcontractors
1 hiring $773.67 $1,221.54
  Average cost per hiring $773.67 $1,221.54

This is an estimate. You can get an accurate quote for your project from a J B P H H additions and remodels pro.

Cost to Hire And Manage Subcontractors - 2025 Cost Calculator

To Hire And Manage Subcontractors in J B P H H you should expect to pay in the range of $773.67 to $1,221.54. What we use to calculate J B P H H Sub-Contractor Management estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Sub-Contractor Management in J B P H H project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per hiring for Sub-Contractor Management in J B P H H

The average cost to Hire And Manage Subcontractors in J B P H H 2025 is $773.67 to $1,221.54 per hiring. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on J B P H H Sub-Contractor Management projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Sub-Contractor Management in J B P H H

  1. Direct labor costs to Hire And Manage Subcontractors in J B P H H - between $773.67 and $1,221.54.

What the J B P H H Sub-Contractor Estimate Includes:

  1. Costs associated with worksite preparation for the Sub-Contractor Management in J B P H H project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local J B P H H materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Sub-Contractor Management projects.

What the Sub-Contractor Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the J B P H H building department.
  2. Hawaii and J B P H H sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the J B P H H Sub-Contractor Management project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services