Let a demolition expert in Cedarbluff give you an estimate on your project Request a FREE Quote
Get a Free Quote
 Loading service costs...
Search

What are the prices for tile mortar bed removal in Cedarbluff MS?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Tile Mortar Labor
Direct labor expenses to remove tile mortar.
21.7 hours $218.06 $598.56
Tile Mortar Debris Disposal Costs
Costs to load and haul away old materials and installation waste.
$91.67 $101.37
Total Cost to Remove Tile Mortar
215 square feet $309.72 $699.92
  Average cost per square foot $1.55 $3.50

This is an estimate. You can get an accurate quote for your project from a Cedarbluff demolition pro.

Cost to Remove Tile Mortar - 2024 Cost Calculator

To Remove Tile Mortar in Cedarbluff you should expect to pay in the range of $309.72 to $699.92. What we use to calculate Cedarbluff Tile Mortar Bed Removal estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Tile Mortar Bed Removal in Cedarbluff project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Tile Mortar Bed Removal in Cedarbluff

The average cost to Remove Tile Mortar in Cedarbluff 2024 is $1.55 to $3.50 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Cedarbluff Tile Mortar Bed Removal projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Tile Mortar Bed Removal in Cedarbluff

  1. Direct labor costs to Remove Tile Mortar in Cedarbluff - between $218.06 and $598.56.

What the Cedarbluff Tile Mortar Removal Estimate Includes:

  1. Costs associated with worksite preparation for the Tile Mortar Bed Removal in Cedarbluff project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Cedarbluff materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Tile Mortar Bed Removal projects.

What the Tile Mortar Removal Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Cedarbluff building department.
  2. Mississippi and Cedarbluff sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Cedarbluff Tile Mortar Bed Removal project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services