Cost to Refinish Sinks - 2024 Cost Calculator
To Refinish Sinks in Straughn you should expect to pay in the range of $198.26 to $380.07. What we use to calculate Straughn Sink Refinishing estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Sink Refinishing in Straughn project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
Average Cost per sink for Sink Refinishing in Straughn
The average cost to Refinish Sinks in Straughn 2024 is $198.26 to $380.07 per sink. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Straughn Sink Refinishing projects always make sure to receive project estimates from several contractors.
Cost Breakdown for Sink Refinishing in Straughn
- Direct labor costs to Refinish Sinks in Straughn - between $174.01 and $341.27.
- Cost of all materials and supplies which may be necessary for Sink Refinishing , which may include: - between $24.25 and $38.80.
What the Straughn Sink Refinishing Estimate Includes:
- Costs associated with worksite preparation for the Sink Refinishing in Straughn project, which may include any costs for materials, components, protection of existing structures and finishes.
- Costs for all local Straughn materials and equipment delivery to the work site.
- Costs for junk/debris removal and job cleanup after project completion.
- Hourly charges, labor setup and mobilization time that are usually associated with Sink Refinishing projects.
What the Sink Refinishing Estimate Does Not Include:
- Any fees for permits or inspection which may be required for the project by the Straughn building department.
- Indiana and Straughn sales taxes on supplies and materials.
- Any general contractor fees for supervision of the Straughn Sink Refinishing project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.