Cost to Repair Leaky Toilets - 2024 Cost Calculator
To Repair Leaky Toilets in Highmore you should expect to pay in the range of $128.28 to $134.70. What we use to calculate Highmore Running Toilet Repair estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Running Toilet Repair in Highmore project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
Average Cost per toilet for Running Toilet Repair in Highmore
The average cost to Repair Leaky Toilets in Highmore 2024 is $128.28 to $134.70 per toilet. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Highmore Running Toilet Repair projects always make sure to receive project estimates from several contractors.
Cost Breakdown for Running Toilet Repair in Highmore
- Direct labor costs to Repair Leaky Toilets in Highmore - between $104.03 and $110.45.
- Cost of all materials and supplies which may be necessary for Running Toilet Repair , which may include: - between $24.25 and $24.25.
What the Highmore Toilet Repair Estimate Includes:
- Costs associated with worksite preparation for the Running Toilet Repair in Highmore project, which may include any costs for materials, components, protection of existing structures and finishes.
- Costs for all local Highmore materials and equipment delivery to the work site.
- Costs for junk/debris removal and job cleanup after project completion.
- Hourly charges, labor setup and mobilization time that are usually associated with Running Toilet Repair projects.
What the Toilet Repair Estimate Does Not Include:
- Any fees for permits or inspection which may be required for the project by the Highmore building department.
- South Dakota and Highmore sales taxes on supplies and materials.
- Any general contractor fees for supervision of the Highmore Running Toilet Repair project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.