Home Remodeling & Home Services Cost Estimates
ITEM | QUANTITY | LOW | HIGH |
---|---|---|---|
|
15.4 hours | $268.50 | $708.63 |
|
$45.84 | $50.69 | |
|
215 square feet | $314.34 | $759.33 |
Average cost per square foot | $1.57 | $3.79 |
To Remove Flooring in J B P H H you should expect to pay in the range of $314.34 to $759.33. What we use to calculate J B P H H Flooring Removal estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Flooring Removal in J B P H H project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
The average cost to Remove Flooring in J B P H H 2025 is $1.57 to $3.79 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on J B P H H Flooring Removal projects always make sure to receive project estimates from several contractors.