Cost to Clean Ducts & Vents - 2024 Cost Calculator
To Clean Ducts & Vents in Salem you should expect to pay in the range of $326.69 to $378.73. What we use to calculate Salem Duct & Vent Cleaning estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Duct & Vent Cleaning in Salem project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
Average Cost per square foot for Duct & Vent Cleaning in Salem
The average cost to Clean Ducts & Vents in Salem 2024 is $0.27 to $0.32 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Salem Duct & Vent Cleaning projects always make sure to receive project estimates from several contractors.
Cost Breakdown for Duct & Vent Cleaning in Salem
- Direct labor costs to Clean Ducts & Vents in Salem - between $304.21 and $356.25.
- Costs of specialty equipment used for efficiency and job quality, which may include: - between $22.47 and $22.47.
What the Salem Duct & Vent Cleaning Estimate Includes:
- Costs associated with worksite preparation for the Duct & Vent Cleaning in Salem project, which may include any costs for materials, components, protection of existing structures and finishes.
- Costs for all local Salem materials and equipment delivery to the work site.
- Costs for junk/debris removal and job cleanup after project completion.
- Hourly charges, labor setup and mobilization time that are usually associated with Duct & Vent Cleaning projects.
What the Duct & Vent Cleaning Estimate Does Not Include:
- Any fees for permits or inspection which may be required for the project by the Salem building department.
- Ohio and Salem sales taxes on supplies and materials.
- Any general contractor fees for supervision of the Salem Duct & Vent Cleaning project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.