Let a demolition expert in Live Oak give you an estimate on your project Request a FREE Quote
Get a Free Quote
 Loading service costs...
Search

What are the costs for countertop removal in Live Oak FL?

Home Remodeling & Home Services Cost Estimates

countertops

ITEM QUANTITY LOW HIGH
Countertop Labor
Direct labor expenses to remove countertops.
2 hours $14.10 $51.36
Countertop Debris Disposal Costs
Costs to load and haul away old materials and installation waste.
$19.40 $24.25
Total Cost to Remove Countertops
1 countertop $33.50 $75.61
  Average cost per countertop $33.50 $75.61

This is an estimate. You can get an accurate quote for your project from a Live Oak demolition pro.

Cost to Remove Countertops - 2024 Cost Calculator

To Remove Countertops in Live Oak you should expect to pay in the range of $33.50 to $75.61. What we use to calculate Live Oak Countertop Removal estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Countertop Removal in Live Oak project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per countertop for Countertop Removal in Live Oak

The average cost to Remove Countertops in Live Oak 2024 is $33.50 to $75.61 per countertop. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Live Oak Countertop Removal projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Countertop Removal in Live Oak

  1. Direct labor costs to Remove Countertops in Live Oak - between $14.10 and $51.36.

What the Live Oak Countertop Removal Estimate Includes:

  1. Costs associated with worksite preparation for the Countertop Removal in Live Oak project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Live Oak materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Countertop Removal projects.

What the Countertop Removal Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Live Oak building department.
  2. Florida and Live Oak sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Live Oak Countertop Removal project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services

Help your friends save money on remodeling costs, like our page!

Facebook

No thanks, I’m just looking.