Let a demolition expert in Sledge give you an estimate on your project Request a FREE Quote
Get a Free Quote
 Loading service costs...
Search

What are the prices for tile removal in Sledge MS?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Tile Labor
Direct labor expenses to remove tile.
26.7 hours $258.88 $695.54
Tile Debris Disposal Costs
Costs to load and haul away old materials and installation waste.
$148.95 $164.73
Total Cost to Remove Tile
215 square feet $407.84 $860.26
  Average cost per square foot $2.04 $4.30

This is an estimate. You can get an accurate quote for your project from a Sledge demolition pro.

Cost to Remove Tile - 2024 Cost Calculator

To Remove Tile in Sledge you should expect to pay in the range of $407.84 to $860.26. What we use to calculate Sledge Tile Removal estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Tile Removal in Sledge project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Tile Removal in Sledge

The average cost to Remove Tile in Sledge 2024 is $2.04 to $4.30 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Sledge Tile Removal projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Tile Removal in Sledge

  1. Direct labor costs to Remove Tile in Sledge - between $258.88 and $695.54.

What the Sledge Tile Removal Estimate Includes:

  1. Costs associated with worksite preparation for the Tile Removal in Sledge project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Sledge materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Tile Removal projects.

What the Tile Removal Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Sledge building department.
  2. Mississippi and Sledge sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Sledge Tile Removal project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services