Let a door installer in Mineral Point give you an estimate on your project Request a FREE Quote

What are the costs for door staining and finishing in Mineral Point WI?

Home Remodeling & Home Services Cost Estimates

doors

ITEM QUANTITY LOW HIGH
Door Labor
Direct labor expenses to stain door.
2.2 hours $65.05 $117.65
Door Job Materials and Supplies
Cost of supplies that may be required to stain door including: masking tape and paper, surface repair material, solvents and cleanup supplies.
1 door $24.25 $38.80
Total Cost to Stain And Finish Doors
1 door $89.30 $156.45
  Average cost per door $89.30 $156.45

This is an estimate. You can get an accurate quote for your project from a Mineral Point doors pro.

Cost to Stain And Finish Doors - 2025 Cost Calculator

To Stain And Finish Doors in Mineral Point you should expect to pay in the range of $89.30 to $156.45. What we use to calculate Mineral Point Door Staining And Finishing estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Door Staining And Finishing in Mineral Point project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per door for Door Staining And Finishing in Mineral Point

The average cost to Stain And Finish Doors in Mineral Point 2025 is $89.30 to $156.45 per door. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Mineral Point Door Staining And Finishing projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Door Staining And Finishing in Mineral Point

  1. Direct labor costs to Stain And Finish Doors in Mineral Point - between $65.05 and $117.65.
  2. Cost of all materials and supplies which may be necessary for Door Staining And Finishing , which may include: - between $24.25 and $38.80.

What the Mineral Point Door Staining And Finishing Estimate Includes:

  1. Costs associated with worksite preparation for the Door Staining And Finishing in Mineral Point project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Mineral Point materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Door Staining And Finishing projects.

What the Door Staining And Finishing Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Mineral Point building department.
  2. Wisconsin and Mineral Point sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Mineral Point Door Staining And Finishing project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services