Cost to Apply Slurry Sealing - 2024 Cost Calculator
To Apply Slurry Sealing in Round O you should expect to pay in the range of $101.32 to $144.01. What we use to calculate Round O Slurry Seal Coating estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Slurry Seal Coating in Round O project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
Average Cost per square foot for Slurry Seal Coating in Round O
The average cost to Apply Slurry Sealing in Round O 2024 is $0.50 to $0.72 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Round O Slurry Seal Coating projects always make sure to receive project estimates from several contractors.
Cost Breakdown for Slurry Seal Coating in Round O
- Direct labor costs to Apply Slurry Sealing in Round O - between $51.71 and $90.29.
- Cost of all materials and supplies which may be necessary for Slurry Seal Coating , which may include: - between $49.61 and $53.72.
What the Round O Slurry Seal Coating Estimate Includes:
- Costs associated with worksite preparation for the Slurry Seal Coating in Round O project, which may include any costs for materials, components, protection of existing structures and finishes.
- Costs for all local Round O materials and equipment delivery to the work site.
- Costs for junk/debris removal and job cleanup after project completion.
- Hourly charges, labor setup and mobilization time that are usually associated with Slurry Seal Coating projects.
What the Slurry Seal Coating Estimate Does Not Include:
- Any fees for permits or inspection which may be required for the project by the Round O building department.
- South Carolina and Round O sales taxes on supplies and materials.
- Any general contractor fees for supervision of the Round O Slurry Seal Coating project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.