Let a drywall contractor in Sharon give you an estimate on your project Request a FREE Quote
Get a Free Quote
 Loading service costs...
Search

What is the price for drywall taping in Sharon KS?

Home Remodeling & Home Services Cost Estimates

linear feet

ITEM QUANTITY LOW HIGH
Drywall Taping Labor
Direct labor expenses to tape drywall joints.
3 hours $200.31 $200.31
Drywall Taping Job Materials and Supplies
Cost of supplies that may be required to tape drywall joints including: fasteners, seam tape and top compound.
50 linear feet $24.25 $24.25
Total Cost to Tape Drywall Joints
54 linear feet $224.56 $224.56
  Average cost per linear foot $4.49 $4.49

This is an estimate. You can get an accurate quote for your project from a Sharon drywall pro.

Cost to Tape Drywall Joints - 2024 Cost Calculator

To Tape Drywall Joints in Sharon you should expect to pay in the range of $224.56 to $224.56. What we use to calculate Sharon Drywall Taping estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Drywall Taping in Sharon project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per linear foot for Drywall Taping in Sharon

The average cost to Tape Drywall Joints in Sharon 2024 is $4.49 to $4.49 per linear foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Sharon Drywall Taping projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Drywall Taping in Sharon

  1. Direct labor costs to Tape Drywall Joints in Sharon - between $200.31 and $200.31.
  2. Cost of all materials and supplies which may be necessary for Drywall Taping , which may include: - between $24.25 and $24.25.

What the Sharon Drywall Taping Estimate Includes:

  1. Costs associated with worksite preparation for the Drywall Taping in Sharon project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Sharon materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Drywall Taping projects.

What the Drywall Taping Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Sharon building department.
  2. Kansas and Sharon sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Sharon Drywall Taping project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services

Help your friends save money on remodeling costs, like our page!

Facebook

No thanks, I’m just looking.