Cost to Grade Driveways - 2024 Cost Calculator
To Grade Driveways in Sebastopol you should expect to pay in the range of $851.99 to $978.27. What we use to calculate Sebastopol Driveway Grading estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Driveway Grading in Sebastopol project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
Average Cost per square foot for Driveway Grading in Sebastopol
The average cost to Grade Driveways in Sebastopol 2024 is $4.26 to $4.89 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Sebastopol Driveway Grading projects always make sure to receive project estimates from several contractors.
Cost Breakdown for Driveway Grading in Sebastopol
- Direct labor costs to Grade Driveways in Sebastopol - between $695.58 and $756.39.
- Costs of specialty equipment used for efficiency and job quality, which may include: - between $156.41 and $221.89.
What the Sebastopol Driveway Grading Estimate Includes:
- Costs associated with worksite preparation for the Driveway Grading in Sebastopol project, which may include any costs for materials, components, protection of existing structures and finishes.
- Costs for all local Sebastopol materials and equipment delivery to the work site.
- Costs for junk/debris removal and job cleanup after project completion.
- Hourly charges, labor setup and mobilization time that are usually associated with Driveway Grading projects.
What the Driveway Grading Estimate Does Not Include:
- Any fees for permits or inspection which may be required for the project by the Sebastopol building department.
- California and Sebastopol sales taxes on supplies and materials.
- Any general contractor fees for supervision of the Sebastopol Driveway Grading project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.