Let a demolition expert in Ponderay give you an estimate on your project Request a FREE Quote

What is the cost for pool removal and backfilling in Ponderay ID?

Home Remodeling & Home Services Cost Estimates

cubic yards

ITEM QUANTITY LOW HIGH
Pool Labor
Direct labor expenses to remove pool.
3 hours $107.95 $161.93
Pool Debris Disposal Costs
Costs to load and haul away old materials and installation waste.
$19.40 $24.25
Pool Equipment Allowance
Job related costs of specialty equipment used for job quality and efficiency, including: skid loader with excavation | demolition | loading attachment..
$156.41 $221.89
Total Cost to Remove a Pool
2 cubic yard $283.76 $408.07
  Average cost per cubic yard $283.76 $408.07

This is an estimate. You can get an accurate quote for your project from a Ponderay demolition pro.

Cost to Remove a Pool - 2025 Cost Calculator

To Remove a Pool in Ponderay you should expect to pay in the range of $283.76 to $408.07. What we use to calculate Ponderay Pool Removal And Backfilling estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Pool Removal And Backfilling in Ponderay project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per cubic yard for Pool Removal And Backfilling in Ponderay

The average cost to Remove a Pool in Ponderay 2025 is $283.76 to $408.07 per cubic yard. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Ponderay Pool Removal And Backfilling projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Pool Removal And Backfilling in Ponderay

  1. Direct labor costs to Remove a Pool in Ponderay - between $107.95 and $161.93.
  2. Costs of specialty equipment used for efficiency and job quality, which may include: - between $156.41 and $221.89.

What the Ponderay Pool Removal Estimate Includes:

  1. Costs associated with worksite preparation for the Pool Removal And Backfilling in Ponderay project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Ponderay materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Pool Removal And Backfilling projects.

What the Pool Removal Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Ponderay building department.
  2. Idaho and Ponderay sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Ponderay Pool Removal And Backfilling project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services