Let a remodeler in Palm Beach give you an estimate on your project Request a FREE Quote
Get a Free Quote
 Loading service costs...
Search

What is the cost for construction project management in Palm Beach FL?

Home Remodeling & Home Services Cost Estimates

projects

ITEM QUANTITY LOW HIGH
Building Project Labor
Direct labor expenses to manage building project.
70.4 hours $560.15 $603.40
Total Cost to Manage Building Projects
1 project $560.15 $603.40
  Average cost per project $560.15 $603.40

This is an estimate. You can get an accurate quote for your project from a Palm Beach additions and remodels pro.

Cost to Manage Building Projects - 2024 Cost Calculator

To Manage Building Projects in Palm Beach you should expect to pay in the range of $560.15 to $603.40. What we use to calculate Palm Beach Construction Project Management estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Construction Project Management in Palm Beach project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per project for Construction Project Management in Palm Beach

The average cost to Manage Building Projects in Palm Beach 2024 is $560.15 to $603.40 per project. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Palm Beach Construction Project Management projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Construction Project Management in Palm Beach

  1. Direct labor costs to Manage Building Projects in Palm Beach - between $560.15 and $603.40.

What the Palm Beach Building Project Estimate Includes:

  1. Costs associated with worksite preparation for the Construction Project Management in Palm Beach project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Palm Beach materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Construction Project Management projects.

What the Building Project Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Palm Beach building department.
  2. Florida and Palm Beach sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Palm Beach Construction Project Management project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services

Help your friends save money on remodeling costs, like our page!

Facebook

No thanks, I’m just looking.