Cost to Paint Trim Molding - 2024 Cost Calculator
To Paint Trim Molding in Zap you should expect to pay in the range of $85.31 to $145.41. What we use to calculate Zap Trim Molding Painting estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Trim Molding Painting in Zap project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
Average Cost per linear foot for Trim Molding Painting in Zap
The average cost to Paint Trim Molding in Zap 2024 is $1.71 to $2.91 per linear foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Zap Trim Molding Painting projects always make sure to receive project estimates from several contractors.
Cost Breakdown for Trim Molding Painting in Zap
- Direct labor costs to Paint Trim Molding in Zap - between $61.06 and $106.61.
- Cost of all materials and supplies which may be necessary for Trim Molding Painting , which may include: - between $24.25 and $38.80.
What the Zap Trim Molding Painting Estimate Includes:
- Costs associated with worksite preparation for the Trim Molding Painting in Zap project, which may include any costs for materials, components, protection of existing structures and finishes.
- Costs for all local Zap materials and equipment delivery to the work site.
- Costs for junk/debris removal and job cleanup after project completion.
- Hourly charges, labor setup and mobilization time that are usually associated with Trim Molding Painting projects.
What the Trim Molding Painting Estimate Does Not Include:
- Any fees for permits or inspection which may be required for the project by the Zap building department.
- North Dakota and Zap sales taxes on supplies and materials.
- Any general contractor fees for supervision of the Zap Trim Molding Painting project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.