Let a demolition expert in Los Fresnos give you an estimate on your project Request a FREE Quote

What is the price for pool removal and backfilling in Los Fresnos TX?

Home Remodeling & Home Services Cost Estimates

cubic yards

ITEM QUANTITY LOW HIGH
Pool Labor
Direct labor expenses to remove pool.
3 hours $87.09 $130.63
Pool Debris Disposal Costs
Costs to load and haul away old materials and installation waste.
$19.40 $24.25
Pool Equipment Allowance
Job related costs of specialty equipment used for job quality and efficiency, including: skid loader with excavation | demolition | loading attachment..
$156.41 $221.89
Total Cost to Remove a Pool
2 cubic yard $262.90 $376.77
  Average cost per cubic yard $262.90 $376.77

This is an estimate. You can get an accurate quote for your project from a Los Fresnos demolition pro.

Cost to Remove a Pool - 2025 Cost Calculator

To Remove a Pool in Los Fresnos you should expect to pay in the range of $262.90 to $376.77. What we use to calculate Los Fresnos Pool Removal And Backfilling estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Pool Removal And Backfilling in Los Fresnos project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per cubic yard for Pool Removal And Backfilling in Los Fresnos

The average cost to Remove a Pool in Los Fresnos 2025 is $262.90 to $376.77 per cubic yard. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Los Fresnos Pool Removal And Backfilling projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Pool Removal And Backfilling in Los Fresnos

  1. Direct labor costs to Remove a Pool in Los Fresnos - between $87.09 and $130.63.
  2. Costs of specialty equipment used for efficiency and job quality, which may include: - between $156.41 and $221.89.

What the Los Fresnos Pool Removal Estimate Includes:

  1. Costs associated with worksite preparation for the Pool Removal And Backfilling in Los Fresnos project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Los Fresnos materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Pool Removal And Backfilling projects.

What the Pool Removal Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Los Fresnos building department.
  2. Texas and Los Fresnos sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Los Fresnos Pool Removal And Backfilling project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services