Cost to Install Wall Tiling - 2024 Cost Calculator
To Install Wall Tiling in Merkel you should expect to pay in the range of $905.08 to $1,831.83. What we use to calculate Merkel Wall Tile Installation estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Wall Tile Installation in Merkel project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
Average Cost per square foot for Wall Tile Installation in Merkel
The average cost to Install Wall Tiling in Merkel 2024 is $4.53 to $9.16 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Merkel Wall Tile Installation projects always make sure to receive project estimates from several contractors.
Cost Breakdown for Wall Tile Installation in Merkel
- Non-discounted retail costs for 215 square feet of Wall Tile Installation - between $282.68 and $672.29.
- Direct labor costs to Install Wall Tiling in Merkel - between $446.04 and $947.31.
- Cost of all materials and supplies which may be necessary for Wall Tile Installation , which may include: - between $125.44 and $135.84.
- Costs of specialty equipment used for efficiency and job quality, which may include: - between $50.93 and $76.39.
What the Merkel Wall Tile Installation Estimate Includes:
- Costs associated with worksite preparation for the Wall Tile Installation in Merkel project, which may include any costs for materials, components, protection of existing structures and finishes.
- Costs for all local Merkel materials and equipment delivery to the work site.
- Costs for junk/debris removal and job cleanup after project completion.
- Hourly charges, labor setup and mobilization time that are usually associated with Wall Tile Installation projects.
What the Wall Tile Installation Estimate Does Not Include:
- Any fees for permits or inspection which may be required for the project by the Merkel building department.
- Texas and Merkel sales taxes on supplies and materials.
- Any general contractor fees for supervision of the Merkel Wall Tile Installation project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.