Let a demolition expert in Holualoa give you an estimate on your project Request a FREE Quote

What is the cost for countertop removal in Holualoa HI?

Home Remodeling & Home Services Cost Estimates

countertops

ITEM QUANTITY LOW HIGH
Countertop Labor
Direct labor expenses to remove countertops.
2 hours $24.89 $90.65
Countertop Debris Disposal Costs
Costs to load and haul away old materials and installation waste.
$19.40 $24.25
Total Cost to Remove Countertops
1 countertop $44.29 $114.90
  Average cost per countertop $44.29 $114.90

This is an estimate. You can get an accurate quote for your project from a Holualoa demolition pro.

Cost to Remove Countertops - 2025 Cost Calculator

To Remove Countertops in Holualoa you should expect to pay in the range of $44.29 to $114.90. What we use to calculate Holualoa Countertop Removal estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Countertop Removal in Holualoa project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per countertop for Countertop Removal in Holualoa

The average cost to Remove Countertops in Holualoa 2025 is $44.29 to $114.90 per countertop. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Holualoa Countertop Removal projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Countertop Removal in Holualoa

  1. Direct labor costs to Remove Countertops in Holualoa - between $24.89 and $90.65.

What the Holualoa Countertop Removal Estimate Includes:

  1. Costs associated with worksite preparation for the Countertop Removal in Holualoa project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Holualoa materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Countertop Removal projects.

What the Countertop Removal Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Holualoa building department.
  2. Hawaii and Holualoa sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Holualoa Countertop Removal project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services