Let a demolition expert in Hammond give you an estimate on your project Request a FREE Quote

What is the price for flooring removal in Hammond OR?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Flooring Labor
Direct labor expenses to remove flooring.
15.4 hours $181.39 $478.74
Flooring Debris Disposal Costs
Costs to load and haul away old materials and installation waste.
$45.84 $50.69
Total Cost to Remove Flooring
215 square feet $227.23 $529.44
  Average cost per square foot $1.13 $2.65

This is an estimate. You can get an accurate quote for your project from a Hammond demolition pro.

Cost to Remove Flooring - 2025 Cost Calculator

To Remove Flooring in Hammond you should expect to pay in the range of $227.23 to $529.44. What we use to calculate Hammond Flooring Removal estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Flooring Removal in Hammond project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Flooring Removal in Hammond

The average cost to Remove Flooring in Hammond 2025 is $1.13 to $2.65 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Hammond Flooring Removal projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Flooring Removal in Hammond

  1. Direct labor costs to Remove Flooring in Hammond - between $181.39 and $478.74.

What the Hammond Flooring Removal Estimate Includes:

  1. Costs associated with worksite preparation for the Flooring Removal in Hammond project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Hammond materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Flooring Removal projects.

What the Flooring Removal Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Hammond building department.
  2. Oregon and Hammond sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Hammond Flooring Removal project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services