Let a landscape architect in Froid give you an estimate on your project Request a FREE Quote
Get a Free Quote
 Loading service costs...
Search

What is the price for pond digging in Froid MT?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Pond Labor
Direct labor expenses to dig pond.
24.2 hours $1,175.46 $1,233.77
Pond Equipment Allowance
Job related costs of specialty equipment used for job quality and efficiency, including: skid loader with excavation | demolition | loading attachment..
$156.41 $221.89
Total Cost to Dig Ponds
215 square feet $1,331.87 $1,455.66
  Average cost per square foot $6.66 $7.28

This is an estimate. You can get an accurate quote for your project from a Froid landscaping pro.

Cost to Dig Ponds - 2024 Cost Calculator

To Dig Ponds in Froid you should expect to pay in the range of $1,331.87 to $1,455.66. What we use to calculate Froid Pond Digging estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Pond Digging in Froid project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Pond Digging in Froid

The average cost to Dig Ponds in Froid 2024 is $6.66 to $7.28 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Froid Pond Digging projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Pond Digging in Froid

  1. Direct labor costs to Dig Ponds in Froid - between $1,175.46 and $1,233.77.
  2. Costs of specialty equipment used for efficiency and job quality, which may include: - between $156.41 and $221.89.

What the Froid Pond Digging Estimate Includes:

  1. Costs associated with worksite preparation for the Pond Digging in Froid project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Froid materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Pond Digging projects.

What the Pond Digging Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Froid building department.
  2. Montana and Froid sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Froid Pond Digging project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services

Help your friends save money on remodeling costs, like our page!

Facebook

No thanks, I’m just looking.