Let a foundation repair contractor in Oxnard give you an estimate on your project Request a FREE Quote

What are the costs for land excavation in Oxnard CA?

Home Remodeling & Home Services Cost Estimates

cubic yards

ITEM QUANTITY LOW HIGH
Land Labor
Direct labor expenses to excavate land.
3 hours $118.59 $177.89
Land Debris Disposal Costs
Costs to load and haul away old materials and installation waste.
$30.93 $34.21
Land Equipment Allowance
Job related costs of specialty equipment used for job quality and efficiency, including: skid loader with excavation | demolition | loading attachment..
$156.41 $221.89
Total Cost to Excavate Land
2 cubic yard $305.95 $433.99
  Average cost per cubic yard $305.95 $433.99

This is an estimate. You can get an accurate quote for your project from a Oxnard foundations pro.

Cost to Excavate Land - 2025 Cost Calculator

To Excavate Land in Oxnard you should expect to pay in the range of $305.95 to $433.99. What we use to calculate Oxnard Land Excavation estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Land Excavation in Oxnard project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per cubic yard for Land Excavation in Oxnard

The average cost to Excavate Land in Oxnard 2025 is $305.95 to $433.99 per cubic yard. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Oxnard Land Excavation projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Land Excavation in Oxnard

  1. Direct labor costs to Excavate Land in Oxnard - between $118.59 and $177.89.
  2. Costs of specialty equipment used for efficiency and job quality, which may include: - between $156.41 and $221.89.

What the Oxnard Land Excavation Estimate Includes:

  1. Costs associated with worksite preparation for the Land Excavation in Oxnard project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Oxnard materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Land Excavation projects.

What the Land Excavation Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Oxnard building department.
  2. California and Oxnard sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Oxnard Land Excavation project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services