Cost to Grade Lots - 2024 Cost Calculator
To Grade Lots in Ellsworth Afb you should expect to pay in the range of $728.58 to $847.40. What we use to calculate Ellsworth Afb Lot Grading estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Lot Grading in Ellsworth Afb project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
Average Cost per square foot for Lot Grading in Ellsworth Afb
The average cost to Grade Lots in Ellsworth Afb 2024 is $3.65 to $4.24 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Ellsworth Afb Lot Grading projects always make sure to receive project estimates from several contractors.
Cost Breakdown for Lot Grading in Ellsworth Afb
- Direct labor costs to Grade Lots in Ellsworth Afb - between $572.16 and $625.51.
- Costs of specialty equipment used for efficiency and job quality, which may include: - between $156.41 and $221.89.
What the Ellsworth Afb Lot Grading Estimate Includes:
- Costs associated with worksite preparation for the Lot Grading in Ellsworth Afb project, which may include any costs for materials, components, protection of existing structures and finishes.
- Costs for all local Ellsworth Afb materials and equipment delivery to the work site.
- Costs for junk/debris removal and job cleanup after project completion.
- Hourly charges, labor setup and mobilization time that are usually associated with Lot Grading projects.
What the Lot Grading Estimate Does Not Include:
- Any fees for permits or inspection which may be required for the project by the Ellsworth Afb building department.
- South Dakota and Ellsworth Afb sales taxes on supplies and materials.
- Any general contractor fees for supervision of the Ellsworth Afb Lot Grading project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.