Let a mason in Turners Station give you an estimate on your project Request a FREE Quote

What is the cost for driveway grading in Turners Station KY?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Driveway Labor
Direct labor expenses to grade driveway.
13 hours $594.14 $646.08
Driveway Equipment Allowance
Job related costs of specialty equipment used for job quality and efficiency, including: skid loader with excavation | demolition | loading attachment..
$156.41 $221.89
Total Cost to Grade Driveways
215 square feet $750.56 $867.97
  Average cost per square foot $3.75 $4.34

This is an estimate. You can get an accurate quote for your project from a Turners Station concrete and masonry pro.

Cost to Grade Driveways - 2025 Cost Calculator

To Grade Driveways in Turners Station you should expect to pay in the range of $750.56 to $867.97. What we use to calculate Turners Station Driveway Grading estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Driveway Grading in Turners Station project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Driveway Grading in Turners Station

The average cost to Grade Driveways in Turners Station 2025 is $3.75 to $4.34 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Turners Station Driveway Grading projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Driveway Grading in Turners Station

  1. Direct labor costs to Grade Driveways in Turners Station - between $594.14 and $646.08.
  2. Costs of specialty equipment used for efficiency and job quality, which may include: - between $156.41 and $221.89.

What the Turners Station Driveway Grading Estimate Includes:

  1. Costs associated with worksite preparation for the Driveway Grading in Turners Station project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Turners Station materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Driveway Grading projects.

What the Driveway Grading Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Turners Station building department.
  2. Kentucky and Turners Station sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Turners Station Driveway Grading project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services