Let a landscape architect in Donald give you an estimate on your project Request a FREE Quote

What is the price for trench backfilling in Donald OR?

Home Remodeling & Home Services Cost Estimates

feet

ITEM QUANTITY LOW HIGH
Trench Labor
Direct labor expenses to backfill trench.
3 hours $143.37 $165.49
Total Cost to Backfill Trenches
26 feet $143.37 $165.49
  Average cost per linear foot $5.73 $6.62

This is an estimate. You can get an accurate quote for your project from a Donald landscaping pro.

Cost to Backfill Trenches - 2025 Cost Calculator

To Backfill Trenches in Donald you should expect to pay in the range of $143.37 to $165.49. What we use to calculate Donald Trench Backfilling estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Trench Backfilling in Donald project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per linear foot for Trench Backfilling in Donald

The average cost to Backfill Trenches in Donald 2025 is $5.73 to $6.62 per linear foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Donald Trench Backfilling projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Trench Backfilling in Donald

  1. Direct labor costs to Backfill Trenches in Donald - between $143.37 and $165.49.

What the Donald Trench Filling Estimate Includes:

  1. Costs associated with worksite preparation for the Trench Backfilling in Donald project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Donald materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Trench Backfilling projects.

What the Trench Filling Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Donald building department.
  2. Oregon and Donald sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Donald Trench Backfilling project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services