Let a landscape architect in Timber give you an estimate on your project Request a FREE Quote

What is the price for trench digging in Timber OR?

Home Remodeling & Home Services Cost Estimates

feet

ITEM QUANTITY LOW HIGH
Trench Labor
Direct labor expenses to dig trench.
3.5 hours $178.67 $187.53
Trench Equipment Allowance
Job related costs of specialty equipment used for job quality and efficiency, including: skid loader with excavation | demolition | loading attachment..
$156.41 $221.89
Total Cost to Dig Trenches
26 feet $335.09 $409.42
  Average cost per linear foot $13.41 $16.37

This is an estimate. You can get an accurate quote for your project from a Timber landscaping pro.

Cost to Dig Trenches - 2026 Cost Calculator

To Dig Trenches in Timber you should expect to pay in the range of $335.09 to $409.42. What we use to calculate Timber Trench Digging estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Trench Digging in Timber project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per linear foot for Trench Digging in Timber

The average cost to Dig Trenches in Timber 2026 is $13.41 to $16.37 per linear foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Timber Trench Digging projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Trench Digging in Timber

  1. Direct labor costs to Dig Trenches in Timber - between $178.67 and $187.53.
  2. Costs of specialty equipment used for efficiency and job quality, which may include: - between $156.41 and $221.89.

What the Timber Trench Digging Estimate Includes:

  1. Costs associated with worksite preparation for the Trench Digging in Timber project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Timber materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Trench Digging projects.

What the Trench Digging Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Timber building department.
  2. Oregon and Timber sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Timber Trench Digging project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services