ITEM | QUANTITY | LOW | HIGH |
---|---|---|---|
|
3 hours | $94.62 | $141.94 |
|
$30.93 | $34.21 | |
|
$156.41 | $221.89 | |
|
2 cubic yard | $281.98 | $398.04 |
Average cost per cubic yard | $281.98 | $398.04 |
To Excavate Land in Brock you should expect to pay in the range of $281.98 to $398.04. What we use to calculate Brock Land Excavation estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Land Excavation in Brock project:
1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button
The average cost to Excavate Land in Brock 2025 is $281.98 to $398.04 per cubic yard. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Brock Land Excavation projects always make sure to receive project estimates from several contractors.