Let a floor contractor in Seattle give you an estimate on your project Request a FREE Quote
Get a Free Quote
 Loading service costs...
Search

What are the costs for basement floor preparation in Seattle WA?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Flooring Labor
Direct labor expenses to prepare basement flooring.
20.9 hours $1,206.81 $1,276.05
Flooring Job Materials and Supplies
Cost of supplies that may be required to prepare basement flooring including: fasteners and connectors.
200 square feet $258.35 $279.77
Flooring Equipment Allowance
Job related costs of specialty equipment used for job quality and efficiency, including: pneumatic framing nailer, 12" miter saw and 3 1/4" electric planer.
$27.65 $46.56
Total Cost to Prepare Basement Flooring
215 square feet $1,492.80 $1,602.38
  Average cost per square foot $7.46 $8.01

This is an estimate. You can get an accurate quote for your project from a Seattle flooring pro.

Cost to Prepare Basement Flooring - 2024 Cost Calculator

To Prepare Basement Flooring in Seattle you should expect to pay in the range of $1,492.80 to $1,602.38. What we use to calculate Seattle Basement Floor Preparation estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Basement Floor Preparation in Seattle project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Basement Floor Preparation in Seattle

The average cost to Prepare Basement Flooring in Seattle 2024 is $7.46 to $8.01 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Seattle Basement Floor Preparation projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Basement Floor Preparation in Seattle

  1. Direct labor costs to Prepare Basement Flooring in Seattle - between $1,206.81 and $1,276.05.
  2. Cost of all materials and supplies which may be necessary for Basement Floor Preparation , which may include: - between $258.35 and $279.77.
  3. Costs of specialty equipment used for efficiency and job quality, which may include: - between $27.65 and $46.56.

What the Seattle Basement Flooring Preparation Estimate Includes:

  1. Costs associated with worksite preparation for the Basement Floor Preparation in Seattle project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Seattle materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Basement Floor Preparation projects.

What the Basement Flooring Preparation Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Seattle building department.
  2. Washington and Seattle sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Seattle Basement Floor Preparation project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services

Help your friends save money on remodeling costs, like our page!

Facebook

No thanks, I’m just looking.