Let a mason in Dinuba give you an estimate on your project Request a FREE Quote

What are the costs for fog seal coating in Dinuba CA?

Home Remodeling & Home Services Cost Estimates

square feet

ITEM QUANTITY LOW HIGH
Fog Seal Labor
Direct labor expenses to topcoat fog seal.
5.5 hours $166.53 $336.09
Fog Seal Job Materials and Supplies
Cost of supplies that may be required to topcoat fog seal including: sealant.
200 square feet $26.21 $48.50
Total Cost to Topcoat Fog Sealant
215 square feet $192.74 $384.59
  Average cost per square foot $0.96 $1.92

This is an estimate. You can get an accurate quote for your project from a Dinuba concrete and masonry pro.

Cost to Topcoat Fog Sealant - 2026 Cost Calculator

To Topcoat Fog Sealant in Dinuba you should expect to pay in the range of $192.74 to $384.59. What we use to calculate Dinuba Fog Seal Coating estimates is average material costs, average hourly labor wages and labor productivity rates. To get a more accurate estimate on your Fog Seal Coating in Dinuba project:

1. Pick the Location of the Project
2. Tell us the size of your Project
3. Click the "Calculate" button

Average Cost per square foot for Fog Seal Coating in Dinuba

The average cost to Topcoat Fog Sealant in Dinuba 2026 is $0.96 to $1.92 per square foot. Always make sure to make all hiring decisions carefully and to make sure the contractor is fully insured, bonded and licensed. It is a good idea to check references and verify prior work quality.
If you want to receive the best value on Dinuba Fog Seal Coating projects always make sure to receive project estimates from several contractors.

Cost Breakdown for Fog Seal Coating in Dinuba

  1. Direct labor costs to Topcoat Fog Sealant in Dinuba - between $166.53 and $336.09.
  2. Cost of all materials and supplies which may be necessary for Fog Seal Coating , which may include: - between $26.21 and $48.50.

What the Dinuba Fog Seal Coating Estimate Includes:

  1. Costs associated with worksite preparation for the Fog Seal Coating in Dinuba project, which may include any costs for materials, components, protection of existing structures and finishes.
  2. Costs for all local Dinuba materials and equipment delivery to the work site.
  3. Costs for junk/debris removal and job cleanup after project completion.
  4. Hourly charges, labor setup and mobilization time that are usually associated with Fog Seal Coating projects.

What the Fog Seal Coating Estimate Does Not Include:

  1. Any fees for permits or inspection which may be required for the project by the Dinuba building department.
  2. California and Dinuba sales taxes on supplies and materials.
  3. Any general contractor fees for supervision of the Dinuba Fog Seal Coating project. Please add 12% to 20% to the total cost shown above if you will be hiring a general contractor to supervise this project.

Grow your business

We connect you with homeowners who are looking for your services